Good beginning and smooth progress in 2003

2 161 projects started more than 148 planned in 2003
2 30 projects completed
2 With an investment of 16.757 billion yuan

Plan in 2004

2 131 items started in 2003 and under way in 2004
2 37 items started in 2003 and to be completed in 2004
2 82 items started in 2004
2 8 items started and to be completed in 2004
2 With an investment of about 19 billion yuan in 2004

Breakthroughs in Suzhou Creek Rehabilitation

Sewage collection system in Huangdu Town of Jiading District
Estuarial floodgate construction and principal project of Mengqingyuan
Substantial progress in Minified Discharge from Interflow Pump Stations into Rivers Project

Initial Achievements in Sewage Treatment in Downtown Area

Zhuyuan and Bailonggang Sewage Plants completed
All-round development of Sewage Treatment Project Phase III

Suburban Sewage Plants and Sewage Collection Systems to be Started at Full-scale

District
Item
Note
Pudong
Gaoqiao Town Sewage Collection System
Started in 2004
Jinshan
Jinshan Sewage Treatment and Drainage to Sea Plant
Started in 2004
Jinshan
Zhujing Sewage Plant
Started in 2004
Songjiang
Yexie Sewage South Drainage Project in Punan Town of Songjiang
Started in 2004
Songjiang
Maogang Sewage Plant and Networks
Started in 2004
Qingpu
Gaota Sewage Plant and Networks
Started in 2004
Qingpu
Jinze Sewage Plant and Networks
Started in 2004
Qingpu
Xicen Sewage Plant and Networks
Started in 2004
Nanhui
Sewage Networks along Nanlu Highway
Started in 2004
Fengxian
East Fengxian District Sewage Plant and Networks
Started in 2004
Chongming
Chengqiao County Sewage Plant and Networks
Started in 2004

 

Smoke Desulfurization, Low-nitrogen Combustion and Highly Efficient Dust Control in New Power Plants

Two 300MW smoke desulfurization feasibilities for coal burning in Waigaoqiao Power Plant, 50% completed
Shanghai Economic Development Committee

One 350MW smoke desulfurization feasibility in Baogang Power Plant with its ground construction completed and part of equipment installed
Baogang Steel Group

Strengthened Pollution Control Over Vehicles in Downtown Area

Update 3000 public traffics in downtown area
Shanghai Traffic Bureau

Establish one or two inspection substations for used vehicles
Shanghai Environmental Protection Bureau


Strengthened enforcement on exhaust pollution control over vehicles within the outer ring roads with compulsory and random inspections for 30,000 vehicles
Shanghai Public Security Bureau


Eliminate 100,000 diesel-driven mopeds
Shanghai Public Security Bureau

In Shanghai the heavily-polluting used vehicles with high exhaust account for 60%-70% of the total.

Dust Control in Downtown Area£­SUCC, SCAESAB, SAFB and Agencies at district level

Changning, Luwan and Jing¡¯an districts involve in establishing demonstration areas of dust pollution control
Control over 27 dumping sites within the inner ring roads:
Xuhui District 5
Pudong New Area 4
Baoshan District 1
Minhang District 10
Yangpu District 5
Putuo District 2

Substantial Measures in Waste Reduction
SCAESAB: Effectively improve the sorting collection system for household refuse

SEDC: Charge fees on plastic bags in supermarkets

SEDC: Package reduction pilot in one or two industries

New Channels for Waste Reuse
SCAESAB:Establish and improve waste collection network in Shanghai
Build three waste comprehensive disposal plants
Comprehensive utilization rate of construction waste attains 93%

Secure Disposal for Hazardous Waste
SCAESAB:
Laogang Project Phase IV
Principle Project of Jiangqiao Waste Incinerator Phase II
SCAESAB¡¢SHAB¡¢Disstricts or counties£º
A batch of waste transferring and compression stations
Demolish about 400 household refuse temporary dumping sites along the upper reach of Suzhou Creek and in districts or counties
SEPB¡¢SMHB:
Basically complete secure disposal system for hospital waste

Continue Rehabilitation of Heavily-polluting Enterprises
SEDC, SSAC:Complete restructuring of 23 polluting enterprises in downtown area
SEDC, SEPB:Carry out cleaner production in 25 enterprises
SDEC, SEDC:Conduct one or two circular economy pilot in one or two industrial zones

Quicken up Rehabilitation of Wusong Industrial Zone
SEDC:Complete district heating system
SEDC, Baogang and Baoshan:Make initial achievements in fugitive dust emission control
SEDC, SSAC:Stop manganese production in Shenjia Ferroalloy Corporation by 2004
Baogang:Shut down outdated and heavily-polluting production lines
Wusong Office:Complete 40% sewage collection system
SWAB:Complete waterways rehabilitation in the zone

Pollution Control on Effluvia in Taopu Industrial Zone
SEDC, SSAC:Complete restructuring of seven city-level enterprises
Putuo local government:Complete restructuring of four district-level enterprises

Start Rehabilitation of Wujing Industrial Zone
SEDC, Minhang local government:
Complete comprehensive rehabilitation plan
Complete greenery belts plan
Complete cost budget for moving out the residents heavily affected by pollution
Push forward rehabilitation of heavily-polluting enterprises

Strengthen Livestock Pollution Control
Close down or move out 125 livestock farms in raising-forbidden area
Complete pollution control over 259 livestock farms
Establish five organic fertilizer processing and reuse centers

Close-down in raising-forbidden areas
Pollution control
Qingpu
12
Jinshan
29
Songjiang
41
Baoshan
10
Jinshan
24
Fengxian
11
Minhang
13
Nonggangshang
26
Fengxian
7
Chongming
10
Baoshan
5
Minhang
2
Nanhui
12
Nanhui
123
Jiading
9
Pudong New Area
6
Nonggongshang
1
Jiading
42
City-level
1

 
Afforestation£¨19 items£©
Public green space in downtown area£¨15 items£©
Forest project in suburban area£¨4 items£©

Environmental policy
SDRC:Formulate policies conducive to the implementation of three-year environmental action plan
SUCC:Establish charging policy for household waste
SEDC:Establish charging policy for plastic bags in supermarkets
SPAB:Develop standards of charging on annual inspection for vehicles
SPAB:Develop standards of charging on hospital waste disposal